Doors and docks tend to get decided late. The floor is drawn, the facade is resolved, and somewhere between developed design and tender they shrink to a line on a schedule. Then the tenant changes, a different truck turns up, or a container door has to be opened away from the shelter in the rain, and a detail that looked fine on paper stops working in use.
Before specifying industrial doors or a loading dock, settle five things: how the opening will be used, which vehicles will use it now and later, how temperature and hygiene shape the loading sequence, which safety controls are non-negotiable, and who has signed off the operational detail before tender.
These five points come from Andrew Suckling’s loading dock session for Ulti at Teulo Ed on 28 October 2026. The full session is on Teulo if you want the detail behind them.
Five things to settle before tender
- How the opening will be used: product, temperature, traffic and tenant change.
- Which vehicles arrive, now and later.
- How temperature and hygiene shape the loading sequence.
- Which safety controls are non-negotiable.
- Who has signed off the operational detail.
Start with how the opening will be used
Product comes last. The first questions are about the operation. What is being loaded, and is it ambient, chilled or frozen? Which vehicles arrive, and what handling equipment crosses the opening? Is this a new build where the geometry can still move, or a retrofit where it cannot? Who is the likely tenant, and what will the next one need?
The same thinking applies to a door opening with no dock behind it. How often it cycles, what activates it, and whether forklifts and pedestrians share the space all change which system fits. Ulti’s industrial door range covers high-speed, freezer and coolroom, insulated sectional, personnel and roller shutter doors, but the right one only becomes obvious once the use is clear. Define the loading scenario first, then document the equipment.
Know the vehicles, now and after the tenant changes
New Zealand fleets are mixed, and the height of the vehicle at the dock changes what the dock needs. Ulti’s dock design guide publishes floor heights from 900mm for a rigid truck to 1,600mm for a refrigerated Pantech. That spread affects leveller range, bumper positon, shelter fit and pit depth, which is why a generic dock detail is risky. On-grade container loading is also common here, and it suits sites that cannot form a conventional recessed dock.
| Vehicle | Floor height |
|---|---|
| Rigid truck | 900 mm |
| Refrigerated Pantech | 1,600 mm |
That spread affects leveller range, bumper position, shelter fit and pit depth.
A dock that works for one operator can be wrong for the next. Documenting a generic detail without knowing the actual freight profile is a pitfall worth avoiding, as is assuming like-for-like replacement will work in retrofit. Ask what is arriving today, and what could arrive when the building changes hands.
Let temperature and hygiene set the loading sequence
In chilled, frozen and hygiene-sensitive buildings the sequence matters as much as the equipment. Opening container or truck doors before docking is simpler, but it suits thermal and hygienic environments less well. Opening them after docking helps hold internal conditions and keeps the seal continuous, though it asks for more coordination between door type, pit detail, leveller choice and where the vehicle stops.
| Doors open before docking | Doors open after docking | |
|---|---|---|
| Complexity | Simpler | More coordination between door type, pit detail, leveller choice and vehicle stop position |
| Thermal and hygiene performance | Suits thermal and hygienic environments less well | Helps hold internal conditions and keeps the seal continuous |
That decision drives the leveller. Vertical dock levellers allow doors to open inside the building, which is why they suit cold chain work. Horizontal levellers are common and cost-effective, and suit sits that can accommodate a suitable pit. You can compare both in Ulti’s dock leveller range.
Seals and shelters then carry the rest of the load. Four-sided sealing, including beneath the leveller where leakage is hardest to control, helps hold temperature, reduces energy loss and keeps out dust, birds, insects and vermin. Ulti’s loading systems range includes the seals and shelters.
For retrofits, external loading pods can avoid major structural changes inside an existing building and protect high-bay or refrigerated floor area. Firewalls, consent pathways and foundations will influence whether a pod or an internal dock is the more practical option.
Treat safety as part of the design, not an add-on
A dock concentrates risk. A truck can leave before loading has finished, a forklift can fall between the vehicle and the dock, an operator can get the sequence wrong, and poorly chosen heights, leveller gradients or bumpers add to all of it. Truck restraints, red and green signals, master interlocks, bumpers and clear labelling belong in the design from the start, not on a punch list.
Ulti’s integrated dock controls put the controls for a vehicle restraint, leveller, dock door and shelter in one panel, with an interlocking system that guides the operator through the correct sequence.
Value engineering is the other risk. Safety-critical items are easy to cut when budgets tighten and easy to lose without anyone noticing. Decide early which features are mandatory for safe function and which are optional, and record the decision.
Settle the detail before tender, and write it down
Early input from the client, the operations team, the architect and the dock provider helps avoid rework later. The items worth confirming before tender are structural loads, drainage, fire requirements, future automation and stakeholder sign-off.
A dock also touches more of the Building Code than an equipment schedule suggests. Check the current acceptable solutions and verification methods on MBIE’s Building Performance site for each clause below.
| Clause | What it covers at the dock |
|---|---|
| B1 Structure | Vehicle impact and heavy handling loads |
| C1 to C6 Protection from Fire | Separation and openings in external walls |
| D1 Access routes | Vehicle and pedestrian separation |
| E2 External moisture | Weathertight loading openings and shelters |
| F4 Safety from falling | Dock edges |
| G1 Personal hygiene | Food and pharmaceutical settings |
Ulti works with architects at this stage through its architect service, and the resource centre holds specs, drawings and CAD files in PDF, DWG and RVT formats. Ulti also has a branded Masterspec work section for commercial and industrial doors, 4576UD.
Watch the full CPD session
Andrew Suckling’s session, Designing loading dock systems for whole-of-life performance, was part of Teulo Ed’s Building Performance: Controlling Air, Water & Access, held on 28 October 2026. It goes deeper than this article on dock system types, the cold chain and the building envelope, safety and interlocks, and specification guidance.
Chris Caiger of Aero Solutions presented the other half of the session, on air tightness and building performance. Teulo lists NZRAB CPD points for the full session, 10 Design and 10 Documentation, and Teulo membership is free.
Working on a project now? Book a free consultation with Ulti’s architect team. For other formats, see Ulti’s CPD options for architects, including morning tea sessions at your office and showroom tours in Auckland.
Questions architects ask about specifying doors and docks
What should architects consider when specifying industrial doors?
Start with how the opening will be used, including traffic, cycle frequency and activation. Then check the temperature and hygiene requirement, the safety controls needed and who has signed off the operational detail. Involving a specialist before tender helps avoid a generic specification.
Why should loading dock design be settled early?
Dock decisions affect floor levels, structure, façade, fire strategy and circulation, so they are hard to change once those are fixed. Ulti’s dock design guide covers this in more detail.
Should container doors open before or after docking?
It depends on the loading scenario. Opening after docking suits cold chain and hygiene-sensitive sites because it helps hold temperature and keeps the seal continuous. Opening before docking is simpler but suits thermal and hygienic environments less well.
Does Ulti offer CPD for architects?
Yes. Ulti offers CPD-accredited online modules, live webinars, morning tea sessions at your office and showroom tours in Auckland. Its latest webinar, on loading dock design, is on Teulo.
Where can I find Ulti specifications and drawings?
The Ulti resource centre has technical documents, drawings, colour charts and spec sheets, including PDF, DWG and RVT downloads. Ulti also has a branded Masterspec work section for commercial and industrial doors.